This is exactly the needed alignment for the loop line. It uses existing alignments. It does not conflict with 24hr freight operations on the Anfield line via Olive Mount Chord and it's a the optimum size at halfway between the outer edge of the system and the centre, thus being the most effective route for transfer between other modal radial routes, as well as a good provider of capacity on short journeys.
Making up to four through Kirkdale will also be much needed providing connection to Northshore (Liverpool part of the Atlantic Gateway Strategic Investment Area) and to Central Docks at a new station at Vauxhall - and there is space on the viaduct.
It can also be used for nodal Park and Ride for strictly local travel by car and into the public transport system. I have heard it said this is good for long car journeys too, but I think once you are in the car for more than say, 10mins, that's where people tend to like to stay.
I have also seen proposal for this to be Merseyrail and so frequent and connected into the existing system. The loop will aso relieve current congestion at Central where too many trais currently reminate by allowing more trains to run through.
Yes, the demand went and that's why it closed but if the population is to come back, it will be much in demand.
This has legs and I am sure we will see more of it.
Interesting stuff on Wapping Tunnel.





Reply With Quote


Bookmarks