Results 1 to 7 of 7

Thread: Nelson swing bridge and control room

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    georgie t
    Guest georgie t's Avatar

    Default

    Quote Originally Posted by Rambers View Post
    @ Georgie t
    Worked on the docks since i was 17. Started on the ports various craft ie floating cranes dredgers survey boats. I then moved to the docks and stages section as a gateman and currently working in the marine operations control room in seaforth as a Dockmaster,Gladstone and Langton locks are operated from here all by remote controll.Also done a bit of time in birkenhead docks as dockmaster.
    spot on that mate its really good to finally spk to someone whos worked around the docks and surrounding areas

    i had a walk along to bramley moore a while ago do you know what the dock wall tunnel is for

    http://www.yoliverpool.com/forum/sho...och&highlight=


  2. #2

    Default

    Yea there called culverts, most of the dock quays have them running under them.They are mainly for electric cables water pipes ect.

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •