It is pretty certain no full passenger station was ever at Hodson St, however that is beside the point that work started on the Waterloo tunnel to branch into Moorfields. As you have walked it Ged, you confirm no work started. Work did start on the branch from Central into the Wapping Tunnel, with tunnel headers at Central cut a number of feet.
The Northern Line tunnel above the Wapping tunnel at Gt George St was dropped into the top of the Wapping tunnel in the 1970s so the Northern line can gradually decline into Central low level. It looks as if trains can move under the tunnel above if the Wapping tunnel is used to take people to the Kings Dock Arena. The Wapping tunnel can be deepened at this point if headroom is a problem.
http://www.yoliverpool.com/forum/att...1&d=1238081712
Consultation Document:
Consulation Document
The problem with Meseyrail extensions is that all they do is play about at the peripherals. Skemersdale is muted and isn't even in Merseyside. 100% focus should be on the city centres of Liverpool and Birkenhead and surrounding inner-city, using the tunnels.
The total lack of assessment in not considering the North End Outer Loop, via West Derby, and the city centre and Birkenhead tunnels shows how useless this organisation is.
What they said:
The possibility of running passenger trains
along the North Mersey and Bootle branches
was examined by the RUS and cannot
yet be recommended. However, future
development and regeneration could lead
to increased demand for such services. Any
such passenger services would need to be
implemented in a way that ensures current and
future freight demand can be accommodated.
There is also a possibility in the longer term
of using other infrastructure, including the
disused Wapping and Waterloo tunnels, to
provide new journey opportunities.
That's all.