Originally Posted by
Waterways
I'm not quite sure how that works. Are you saying there was a widening of the tunnel at this point?
Hi
Yes the cutting was wider as effectively it had to accomodate four lines. The two normal running lines plus a runoff to the side of one of them and another into the middle between them like this if you get what I mean.
div>
Edge Hill
>__________________\___________________ Waterloo
<__________________/___________________
The cutting here is close to the base of rising gradients towards Edge Hill and Waterloo.
I will scan an extract of a plan and post when I get a chance.
Regards
Mike
Bookmarks