Quote Originally Posted by Lukeo25 View Post
they will have to improve the loop tunnel and update the track and if they do direct service they could use the stock interchange line for services from cental low level or from lsp
The loop is fine, it is capable of many more trains per hour than currently use it

The Welsh Assembly want the trains to run from Wrexham to the loop, through the stock interchange tunnel and onto he airport. They haven't realised that currently the airport has neither a railway line or station though