The tower is to be built on Princes half-tide Dock on and island in the centre. They screwed this up by reducing the depth to canal boat depths preventing sea going vessels entering. A stuipd thing to do. The half-tide river lock gates could have been brought back into use. The models and renders all have sea going vessels scattered about. Maybe these will be cardboard cutouts.
div>
If the Mersey barrage is built the river water will be locked in and all these locks can be opened allowing free movement onto the river and the dock waters. The barrage never seems to go away. It shoudl be built ASAP after all this time.
They need to dredge the filled in docks to sea vessel depths again to add value to these schemes.
Bookmarks