Liverpool has:
- numerous disused rail tunnels under its streets (some amongst the oldest in the world)
- a collection of disused underground stations.
- more disused overground stations than any other British city, complete with lines.
These disused stations and lines just need seamlessly merging into the system. The city should concentrate and prioritise on its rapid transit rail system and extending it, not wasting money on unneeded trams - which is another rail system. The rail system system is already there.
Trams and light rail may compete the picture, however in Liverpool they are waste of expensive time and resources at the present, as the infrastructure for extending the existing rapid transit rail system is already largely there.
Objections to the trams:Objections
6.5 In the view of a number of objectors, there is no clear need for Merseytram Line 1 in transportation terms. Passengers between Kirkby and Liverpool city centre are already catered for by the fast, frequent and recently refurbished Merseyrail Electrics trains.
6.12 Merseytravel has demonstrated no transport need for the proposed tram. There is a train service between Kirkby Railway Station and central Liverpool which provides a train every 15 minutes, with a journey time also of only 15 minutes. There is a frequent bus service in the Line 1 corridor. The time saving for most journeys within the line 1 corridor resulting from use of the proposed tram rather than the bus is at most 5 minutes. Even this claimed marginal advantage is misleading because it takes no account of the additional waiting time for the tram or of the longer average walk to the tram stop predicated by the wider tram catchment area compared with that of the bus. There is ample bus capacity: a bus can carry up to 50 passengers, but average use is only 12 to 14 passengers per bus.
6.34 The scheme would meet no identified transport need, and, indeed, would damage competing transport undertakings such as local trains and buses by unfair competition. There is already a train service between Kirkby and Liverpool run by Merseyrail.
there is currently a bus service between Kirkby and Liverpool city centre on average about every two minutes. There is accordingly no need or natural demand for a tram.
Mersey Docks and Harbour Company (OBJ/269)
The [tram] scheme is poorly targeted and does not represent good value for money. The money could be better spent on other projects, including the provision of a new deepwater harbour and cruise liner terminal, or improvements to local roads and the provision of a rapid rail link to Liverpool Airport.
6.41 It is self-evident that by promoting a tram which is largely to be publicly funded, in direct competition with buses and trains which are in large part without public subsidy, Merseytravel is acting in contravention of EU competition law. Any grant of public money would be challengeable in court or before the European Competition Commissioner.