Originally Posted by
Waterways
div>
When the tower was rising there was a covered section where the fellas worked - no crane. The covered bit looked like the bit on the top right now. The concrete was fed from the inside. It reached full height and the covers came off and a small crane was fitted at the top. This lifted the concrete sections that made the two saucers - floor and roof. As much as possible was taken up via the crane, rather than inside.
the reflection of the top of the photographers head and the camera makes this picture even more quirky